<?xml version="1.0" encoding="utf-8" standalone="yes"?><rss version="2.0" xmlns:atom="http://www.w3.org/2005/Atom"><channel><title>Posts on Shifting Spectrums</title><link>https://fenfir.github.io/shifting_spectra/posts/</link><description>Recent content in Posts on Shifting Spectrums</description><generator>Hugo -- gohugo.io</generator><language>en</language><lastBuildDate>Sat, 15 Jul 2023 23:45:00 +0200</lastBuildDate><atom:link href="https://fenfir.github.io/shifting_spectra/posts/index.xml" rel="self" type="application/rss+xml"/><item><title>Assembly day</title><link>https://fenfir.github.io/shifting_spectra/posts/assembly-day/</link><pubDate>Sat, 15 Jul 2023 23:45:00 +0200</pubDate><guid>https://fenfir.github.io/shifting_spectra/posts/assembly-day/</guid><description>Another Saturday, another day of building in the Hinterhof&amp;hellip;
We got off to a later start than anticipated, but still managed a solid 8 hours of build time before a thunderstorm rolled in. Sven stopped by in the early afternoon to help assemble the largest hexagon structure, bringing his tools and carpentry skills to knock out a major part of the build. This structure stands just shy of 2.2m tall. Curtsi arrived later in the evening, after making a stop at OBI to pick up the type of screws we needed to secure the metal inlays in each hexagon.</description></item><item><title>Build day #4</title><link>https://fenfir.github.io/shifting_spectra/posts/build-4/</link><pubDate>Sat, 08 Jul 2023 22:00:21 +0200</pubDate><guid>https://fenfir.github.io/shifting_spectra/posts/build-4/</guid><description>To start the day, Zach and I made a quick stop at OBI to pick up some lumber for the last frame pieces. We then spent the afternoon putting down some primer and the first coat of paint on the next three hexagon frames and corner braces. All together, a long, hot, 8-hour day - but solid progress made as the clock ticks down to Kiez Burn.</description></item><item><title>Group Build #3</title><link>https://fenfir.github.io/shifting_spectra/posts/group-build-3/</link><pubDate>Sat, 01 Jul 2023 20:30:14 +0200</pubDate><guid>https://fenfir.github.io/shifting_spectra/posts/group-build-3/</guid><description>Otto and Diarmaid joined us for another afternoon of building in the Hinterhof. We finished up the last bits of cutting for the corner braces and planned out the layout for the two largest structures. A brief, but productive session&amp;hellip;</description></item><item><title>Group Build #2</title><link>https://fenfir.github.io/shifting_spectra/posts/group-build-2/</link><pubDate>Sat, 24 Jun 2023 13:36:33 +0200</pubDate><guid>https://fenfir.github.io/shifting_spectra/posts/group-build-2/</guid><description>We spent a full day, racing against the rain and a block party happening in my Hinterhof a few hours later, cutting out pieces to assemble into the next 3 (4?) hexagons. In the end we ran out of time to finish the cutting. We managed to get about 75% of the cutting we wanted to finish done, but we still made massive progress.</description></item><item><title>Art Baer</title><link>https://fenfir.github.io/shifting_spectra/posts/art-baer/</link><pubDate>Thu, 01 Jun 2023 13:35:59 +0200</pubDate><guid>https://fenfir.github.io/shifting_spectra/posts/art-baer/</guid><description>On June 1st-4th the initial version of Shifting Spectrums was intalled at a local event near Leipzig, Art Baer
This version had just one of the hexagons, and no touch controller. We were using WLED to drive the LEDs and created a playlist of suble effects that ran for 3 days creating a calming space to sit back and enjoy the lights.</description></item><item><title>Group Build #1</title><link>https://fenfir.github.io/shifting_spectra/posts/group-build-1/</link><pubDate>Sat, 13 May 2023 13:36:21 +0200</pubDate><guid>https://fenfir.github.io/shifting_spectra/posts/group-build-1/</guid><description>We spent some time cutting the pieces to assemble the first hexagon. A couple of people came to help out with the laying out of the pattern and cutting. The braces were cut from plywood, and the edges were cut from some framing lumber. We managed to get the first one completely built and installed a strip of lights from an earlier pathfinder version.
Amy spent the next couple of days laying down primer and painting the frame with a nice glittery effect.</description></item></channel></rss>